PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripped the shear wall panels and the Elev. 1,2,3 door frames Facing South-West (800x600).jpg Deconstructing the shear wall panels Facing North (800x600).jpg Installing rebar mats at Elev. 4 (4th Floor) Facing South (800x600).jpg Installing rebar mats at Stair -2 (4th Floor) Facing South (800x600).jpg Backfilling and compacting at Room 105 (Servery) Facing East (800x600).jpg Continued installing the underground Tele-Data piping at Rahway Ave. Facing the Administration Building (800x600).jpg Excavating at Rahway Ave. in front of the Court building  (800x600).jpg Installing the underground Tele-Data piping at Rahway Ave. Facing the new Court Building (800x600).jpg Paved manhole at Rahway Ave. Facing the new Court Building (800x600).jpg
Previous pageNext page Backfilling and compacting at Room 105 (Servery) Facing East (800x600)
Backfilling and compacting at Room 105 (Servery) Facing East (800x600)